RDS unit Turnaround

REACTOR

Descriptions

Client: FORMOSA PETROCHEMICAL CORPORATION
Vessel ID: 4.9m
Date: 2009~2022
Work scope:
* Passivation
* Unloading and loading of the catalyst under inert or normal atmospheres
* Internal removal, repair & installation
* Flange dry ice cleaning
* DP inspection
* 3D water jetting
* Tray water jet cleaning
* Thermocouple pressure test
* Catalyst transportation, storage
* Bolt tensioning
* Bolt maintenance

TOP