WOU unit Turnaround Catalyst Changeout

REACTOR

Descriptions

Client: FORMOSA PETROCHEMICAL CORPORATION
Vessel ID: 1m
Date: 2018.07
Work scope:
* unload by bucket as require
* Spent catalyst storage & recycle (recycle rate reachs 99.9%)
* Internal removal, repair & installation
* Inspection & cleaning
* Catalyst loading (dense)
* Bolt tensioning and nut splitting

TOP